Admin Admin
帖子数 : 396 积分 : 1185 威望 : 0 注册日期 : 12-04-10
| 主题: Adidas Porsche Bounce S2 周四 十一月 01, 2012 8:10 am | |
| The doc document may at the WAP end of browsing experience poor.Suggest that you first select the TXT, or download the source files to this machine view.Relay protection test field work instruction work location: task: the seizure of property: the responsible person: the team signed audit: people: Approval: Number: first page 35 of Eastern smooth SOP Eastern smooth operation instruction-- inspection instructions -- inspection instructionsOne, the scope of this work instruction applied in two, normative quote file "work instruction guidelines" (born 2008) (No. 19) Adidas Porsche Bounce S2 "China Southern Power Grid Relay Protection and the two loop acceptance" "China Southern Power Grid Relay Protection and anti accident measures assembly" DL/ T 995-2006 "for relaying protection and security automatic equipment rules for the inspection of three, support for file" Eastern smooth - device specification construction drawing, testing report.Four, the risk analysis of Eastern smooth protective device field inspection work.Sequence number checking device of dangerous point number, good isolation measures, prevent wrong interval caused 1 protection misoperation of high voltage electric shock preventing diagram or 2345678 false false jump operation equipment cross operation, operation process, prevent mutual fire prevent leakage of demolition, mistakenly removed, leakage recovery, error recovery measures to prevent improper mistaken jump run a device for preventing current two open circuit or short circuit voltage two to prevent voltage circuit is energized causing reverse charging prevent meter range caused by improper selection of mistaken jump operation device control measures second page 35 of five, 5.1, 5.1, time limit for a project the job preparation from planned working time to 5.2 5.2 preparationSequence number according to the Adidas Porsche Bounce S L specific content of acceptance requirements, personnel arrangement 1 Adidas Porsche Bounce and division of tasks according to the acceptance tasks, staff familiar with the acceptance of 2 content, schedule, work standards, safety precautions according to acceptance tasks, develop plans; series 3 for acceptance inspection instructions; expansion project shall fulfil the job ticket request all the staff familiar with the respective tasks and the acceptance of the work content, the schedule requirements, standards and safety precautions standard note years month and day time divided into 5.3 5.3 instruments and apparatus5.3.1 instrument examination, examination is complete, eligible number 123 of insulation tester relay http://www.porschedesignbounces2.com/ protection three-phase tester ONLLY 460 calibrator test line clamp phase meter current voltage and signal phase limit: 360 root only 201 specifications 1000V file DW30A Table 1 units only number of completed "" completed "" 1 page third a total of 35 resolution: 1 precision 1 level current limit: 200mA/2A/10 voltage limit: 200/500V 4 5.3.2 tools to check all qualified name multipurpose power socket or a single 1 phase three wire cable tray 2345678 5.3.3 technical data check all qualified number 123 control device technology and manual 412 digital multimeter FULK15B block 1 specification unit quantity completed "" complete "" 220V/10A toolbox serial data line brush insulating gloves mark pen gauze 1.5 "(including professional tools) only root volume to support several 12 known copies of number of completed units" "finish". "The sword river PRC92-12B stability control cabinet screen design stability | |
|